Cost Savings Calculator

  • Just insert your unit cost, number of cribs and the average height and then look below for the $ difference in the systems including installed weight at the bottom.
  • 6 x 6 4Pt 1.2m Crib (traditional pig sty)
  • 100 % Contact 1m Square
  • 100 % Contact Rhinoloc Tri
  • In summary a Rhinoloc Tri configuration will save approximately ${{T2 - T3}} in direct timber costs for {{TN}} cribs at {{HT}} m high................................................ there will also be approximately {{(T2/TC*.0112)-(T3/TC*.0112)}} tonnes LESS of timber which needs to be transported, stored and shifted down the pit to be installed by the workforce.